top of page

COMMERCIAL

OFFICES - SHOPS - CINEMAS - SCHOOLS

INITIAL WORKS

  • Project Design & Management
  • CDM Regulation Assistance
  • Strip-out Works
  • Asbestos Consultation
  • Preparatory Works
  • Site Security Assessment​
  • Welfare Facility Assessment​
  • Structural Engineer Calculations

INSTALLATION WORKS

  • Office Partitioning
  • Suspended Ceilings
  • Flooring
  • ​Classroom Design
  • Exterior Landscaping
  • WC Blocks
  • Kitchen / Canteen Area
  • Decoration
  • Electrical / Plumbing Works
  • Structural Alterations
  • Perimeter Fencing

SPECIALIST WORKS

  • DDA Requirement Works
  • Data Centre Installations
  • Landlords Dilapidation Works
  • Diamond Drilling / Cutting
  • Scaffolding
  • Access Equipment Assessment
  • School Refurbuishment Projects
  • Mezzanine Floors
  • Insurance Company Works

WHAT'S UP?

NEW LONG WHEEL BASE VAN

 

We have invested in another van to join our fleet of vehicles. The Nissan NV400 long wheel base model has already proved its usefulness, with the ability to carry longer lengths of material in a safe manner without the need for a roof rack. Hopefully it will be visiting a site near you soon !

CONTACT DETAILS

Unit 3, Birchbrook Industrial Park, Birch Brook Lane, Shenstone WS14 0DJ
 

Tel : 0345 388 1250 / 01543 898188           Fax : 0872 111 7545

Sandfords Construction Ltd          VAT Reg No 655 2565 23          Company Reg No 2823067 England

bottom of page